UL DetailTrade DetailDescriptionF-RatingT-RatingL-RatingW-Rating
F-C-0002F-C-0002 Max. 2" dia blank opening  () 1 or 2-hr   
F-C-1009F-C-1009 Max. 4" steel, cast iron, copper, conduit or EMT pipe (AS=0" to 1") 1 or 2-hr   
F-C-1059F-C-1059 Max. 6" steel, cast iron, conduit, max. 4" EMT, or max. 2" flexible steel conduit  () 1 or 2-hr   
F-C-1097F-C-1097 Max. 4" steel, copper, steel conduit or EMT pipe (AS=0" to 7/8") () 1-hour   
F-C-1106F-C-1106 Max. 4" steel, cast iron, copper, conduit, or EMT  () 1-hour   
F-C-1134F-C-1134 Max. 4" cast iron closet flange with cast iron fittings  () 1-hour   
F-C-1135F-C-1135 Max. 1-1/2" cast iron P-trap with PVC, ABS, or brass bathtub waste/overflow fittings  () 1-hour   
F-C-1142F-C-1142 Max. 1" copper, steel, cast iron, steel conduit, or EMT  () 1-hour   
F-C-1147F-C-1147 Max. 1" flexible steel conduit or gas piping (max qty = 3) (AS=0" to 1-1/4") () 1-hour   
F-C-2005 (cUL)F-C-2005 (cUL) Max. 1” PEX or Aquarise CPVC Plastic Pipe (System tested to 50Pa Pressure Differential) () 1 Hour   
F-C-2006 (cUL)F-C-2006 (cUL) Max. 2” PVC, CPVC, ABS, or Aquarise CPVC Plastic Pipe (System tested to 50Pa Pressure Differential) () 1 Hour   
F-C-2007 (cUL)F-C-2007 (cUL) Max. 4” PVC, CPVC, or Aquarise CPVC Plastic Pipe (System tested to 50Pa Pressure Differential) () 1 Hour   
F-C-2009 (cUL)F-C-2009 (cUL) Max. 1-1/2” PVC or ABS bathtub fittings (System tested to 50Pa Pressure Differential) () 1 Hour   
F-C-2010 (cUL)F-C-2010 (cUL) Max. 4” PVC or ABS closet flange () 1 Hour   
F-C-2011 (cUL)F-C-2011 (cUL) Max. 4” PVC, ABS, CPVC, or 3” Aquarise CPVC Plastic Pipe (System tested to 50Pa Pressure Differential) () 1 Hour   
F-C-2029F-C-2029 Max. 4" PVC or CPVC (closed or open)  () 2-hour   
F-C-2030F-C-2030 Max. 3" PVC, CPVC, ABS or FRPP (c,v) (AS=0" to 1/2") () 1-hour   
F-C-2035 (cUL)F-C-2035 (cUL) Max. 2" Fusiotherm or Climatherm PP (closed) () 1-hour1-hour  
F-C-2035 (cUL)F-C-2035 (cUL) Max. 2" Fusiotherm or Climatherm PP (closed) () 1-hour   
F-C-2071F-C-2071 Max. 2" PVC or CPVC (c,v) (AS=1/4" to 3/8") () 1 or 2-hr   
F-C-2081F-C-2081 Max. 1" Polyethylene (PEX) SDR 9 Tubing (c,v) (AS=0" to 1/2") () 1 or 2-hr   
F-C-2128F-C-2128 Max. 2" ABS, PVC or CPVC (c,v) (AS=0" to 5/8") 1 or 2-hr   
F-C-2142F-C-2142 Max. 2" ABS, PVC or CPVC (c,v) (AS=0" to 5/8") () 1-hour   
F-C-2160F-C-2160 Max. 2" PVC or CPVC  () 1 or 2-hr   
F-C-2189F-C-2189 Max. 2" ABS or PVC tub drain (closed or open)  () 1-hour   
F-C-2203F-C-2203 Max. 4" ABS or PVC toilet flange  (AS=0" to 1") 1-hour   
F-C-2204F-C-2204 Max. 1-1/2" PVC or ABS plastic pipe and Tub Drain Fittings  () 1-hour   
F-C-2205F-C-2205 Max. 1-1/2" PVC or ABS plastic pipe and Tub Drain Fittings  () 1-hour   
F-C-2230F-C-2230 Max. 1" PEX (closed or open)  () 1-hour   
F-C-2231F-C-2231 Max. 2" PVC, CPVC or ABS (closed or open)  () 1-hour   
F-C-2232F-C-2232 Max. 4" PVC or CPVC (c,v) with optional pipe coupling  (AS=0" to 1/2") 1-hour   
F-C-2262F-C-2262 Max. 1-1/2" PVC or ABS plastic pipe and Tub Drain Fittings  () 1-hour   
F-C-2263F-C-2263 Max. 4" ABS or PVC toilet flange  () 1-hour   
F-C-2270F-C-2270 Max. 2" FlowGuard Gold or Blazemaster CPVC (c) (AS=0" to 5/8") () 1-hour   
F-C-2310F-C-2310 Multiple 1" PEX (max qty = 3)  () 1 or 2-hr   
F-C-2334F-C-2334 Maximum 1" Polyethylene (PEX) SDR 9 Tubing (closed or open)  () 1-hour   
F-C-2335F-C-2335 Maximum 3" PVC, ABS, CPVC, or RNC (c,v) (AS=3/16" to 5/16") 1-hour   
F-C-2378 (cUL)F-C-2378 (cUL) Max. 2” PVC, ABS, CPVC, Aquarise CPVC, or 1” PEX () 1 Hour   
F-C-2382F-C-2382 Max. 4" PVC or ABS with branch line (c,v) (AS=0" to 1/2") 1-hour   
F-C-2389F-C-2389 Max. 3" PVC or CPVC (c,v) (AS=0" to 5/8") 1-hour   
F-C-3012F-C-3012 Cable bundle (various cables)  () 1 or 2-hr   
F-C-3044F-C-3044 Cable bundle (various cables) (AS=3/4") () 1-hour   
F-C-3071F-C-3071 Cable bundle (various cables) (AS=0" to 1") () 1-hour   
F-C-3074F-C-3074 Cable bundle (various cables) (AS=0" to 1") 1-hour   
F-C-3094F-C-3094 Multiple SER cables in slotted opening  () 1-hour   
F-C-5004F-C-5004 Max. 2" steel, copper, conduit or EMT pipes with max. 1/2" glass fiber or max. 3/4" AB/PVC insulation (AS varies) () 1 or 2-hr   
F-C-5036F-C-5036 Max. 2" copper, or steel pipe with max. 1-1/2" glass fiber  () 1-hour   
F-C-5037F-C-5037 Max. 2" copper, or steel pipe with max. ¾" AB/PVC insulation  () 1-hour   
F-C-5065F-C-5065 Max. 4" copper, cast iron or steel pipe with ¾" AB/PVC insulation  () 1-hour   
F-C-5066F-C-5066 Max. 4" copper, cast iron or steel pipe with 1-1/2" glass fiber  () 1-hour   
F-C-7013F-C-7013 Max. 4" diameter sheet metal duct w/o damper (min 28Ga)  () 1-hour   
F-C-7025F-C-7025 Max. 10" diameter (min. 28 Ga) or 4" diameter (min. 30 Ga) sheet metal duct w/o damper  () 1-hour   
F-C-7036F-C-7036 Steel Grease or Air Duct with Firemaster DuctWrap by Thermal Ceramics  () 1 or 2-hr   
F-C-7042F-C-7042 Mechanical support mechanisms (strut, steel cable, steel rod, steel angle)  () 1-hour   
F-C-7043F-C-7043 Max. 12" x 10" sheet metal duct (AS=0" to 1") () 1-hour   
F-C-8003 (cUL)F-C-8003 (cUL) Insulated and non-insulated metallic, PEX lines, and cables  () 1 Hour   
F-C-8009F-C-8009 Single HVAC Line Set  () 1-hour   
F-C-8014F-C-8014 Single HVAC Line Set (AS=1/4" to 3/4") () 1-hour   
F-C-8026F-C-8026 Double HVAC Line Set (pvc drain)  () 1-hour   
F-C-8032F-C-8032 Double HVAC Line Set (no pvc drain)  () 1-hour   
F-C-8044F-C-8044 Multiple penetrating items (metal, insulated, PEX, cables) through 14" x 5-1/2" block out (AS=0" to 1-1/2") 1-hourX