| UL Detail | Trade Detail | Description | F-Rating | T-Rating | L-Rating | W-Rating |
| F-A-0001 (cUL) | F-A-0001 (cUL) |
Max. 10” dia blank opening (2-1/2” concrete floor) ()
| 2 Hour | | | |
| F-A-0005 | F-A-0005 |
Blank CP 680-P (2-1/2" Concrete) ()
| 2-hour | | | |
| F-A-0006 | F-A-0006 |
Blank CP 680-P ()
| 3-hour | | | |
| F-A-0008 | F-A-0008 |
Max. 6" un-sleeved opening ()
| 2-hour | | | |
| F-A-0012 | F-A-0012 |
Max. 30" x 12" or 12" diameter blank opening ()
| 3-hour | | | |
| F-A-0014 | F-A-0014 |
Blank CP 680-M or CP 680-P ()
| 3-hour | | | |
| F-A-1002 (cUL) | F-A-1002 (cUL) |
Max. 4” steel, cast iron, or copper with 1” to 1-1/2” glass fiber (2-1/2” concrete floor) ()
| 2 Hour | | | |
| F-A-1003 (cUL) | F-A-1003 (cUL) |
Insulated or non-insulated metallic pipes, conduits and cables (single or bundled) in max. 30" x 48" opening ()
| 2 Hour | | | |
| F-A-1004 (cUL) | F-A-1004 (cUL) |
Max. 1-1/2” Brass waste over flow fittings with PVC drain (System tested to 50Pa Pressure Differential) ()
| 2 hr | | | |
| F-A-1005 (cUL) | F-A-1005 (cUL) |
Max. 1-1/2” Brass waste over flow fittings with PVC drain (System tested to 50Pa Pressure Differential) ()
| 2 hr | | | |
| F-A-1014 | F-A-1014 |
Max. 12" steel, 6" copper, conduit or 4" EMT pipe ()
| 2-hour | | | |
| F-A-1016 | F-A-1016 |
Max. 6" steel, cast iron, copper, conduit, or max. 4" EMT pipe (2-1/2" Concrete) ()
| 2-hour | | | |
| F-A-1017 | F-A-1017 |
Max. 6" steel, cast iron, copper, conduit, or max. 4" EMT pipe ()
| 3-hour | | | |
| F-A-1018 | F-A-1018 |
Max. 1" flexible steel conduit ()
| 2-hour | | | |
| F-A-1022 | F-A-1022 |
Max. 1" steel, copper, cast iron, steel conduit or EMT (Max. Qty 5) ()
| 3-hour | | | |
| F-A-1023 | F-A-1023 |
Max. 2" and 3" Steel conduit or EMT ()
| 3-hour | | | |
| F-A-1028 | F-A-1028 |
Max. 30" steel, cast iron, 6" copper, conduit or 4" EMT (Sleeve Optional) ()
| 2-hour | | | |
| F-A-1029 | F-A-1029 |
Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe ()
| 2-hour | | | |
| F-A-1037 | F-A-1037 |
Tub Box with max. 1-1/2" brass waste/overflow fittings ()
| 3-hour | | | |
| F-A-1038 | F-A-1038 |
Tub Box with max. 1-1/2" brass waste/overflow fittings ()
| 3-hour | | | |
| F-A-1051 | F-A-1051 |
Max. 2" Copper, brass or cast iron waste/overflow fittings ()
| 2-hour | | | |
| F-A-1066 | F-A-1066 |
Multiple 1-1/2" steel pipe, steel conduit, EMT, or max. 1" Copper (Max. Qty 4) ()
| 3-hour | | | |
| F-A-1091 | F-A-1091 |
Max. 6" steel, cast iron, steel conduit, max. 4" EMT or max. 2" copper ()
| 4 Hr | | | |
| F-A-1105 | F-A-1105 |
Max. 10" steel, cast iron, 6" steel conduit, or 4" EMT ()
| 2-hour | | | |
| F-A-1106 | F-A-1106 |
Max. 6" steel, cast iron, steel conduit, or EMT ()
| 2-hour | | | |
| F-A-1108 | F-A-1108 |
Max. 3" steel or cast iron with closet flange (AS=min 3/8")
| 2-hour | | | |
| F-A-1119 | F-A-1119 |
Max. 8" steel, cast iron, max. 6" steel conduit, max. 4" copper or EMT (optional sleeve) (2-1/2" concrete) (AS=0" to 2")
| 2-hour | | | |
| F-A-2005 (cUL) | F-A-2005 (cUL) |
Max. 6” steel, copper, cast iron, steel conduit, and 4” EMT (2-1/2” concrete floor) ()
| 2 Hour | | | |
| F-A-2006 (cUL) | F-A-2006 (cUL) |
Max. 24” steel, cast iron; max. 6” copper, steel conduit; or max. 4” EMT (2-1/2” concrete floor) ()
| 2 Hour | | | |
| F-A-2009 (cUL) | F-A-2009 (cUL) |
Max. 1-1/2” PVC with waste over flow fittings (System tested to 50Pa Pressure Differential) ()
| 2 Hour | | | |
| F-A-2012 (cUL) | F-A-2012 (cUL) |
Max. 1-1/2” PVC with waste over flow fittings (System tested to 50Pa Pressure Differential) ()
| 2 Hour | | | |
| F-A-2013 (cUL) | F-A-2013 (cUL) |
Max. 2” PVC, CPVC, PEX, or Aquarise CPVC (Includes Hollow Core) (System tested to 50Pa Pressure Differential) ()
| 2 Hour | | | |
| F-A-2025 | F-A-2025 |
Max. 6" PVC, CPVC, FRPP or ABS (closed or open) ()
| 2-hour | | | |
| F-A-2025 (cUL) | F-A-2025 (cUL) |
Max. 6” PVC, FRPP, CPVC, max. 4” ABS or max. 3” Aquarise CPVC Plastic Pipe (2-1/2” and 4-1/2” concrete floor) (System tested to 50Pa Pressure Differential) ()
| 1, 2, or 3 Hr | | | |
| F-A-2026 (cUL) | F-A-2026 (cUL) |
Max. 2” PEX Plastic Pipe (2-1/2” concrete floor) (System tested to 50Pa Pressure Differential) ()
| 2 or 3 Hr | | | |
| F-A-2034 (cUL) | F-A-2034 (cUL) |
Max. 6” PVC, CPVC, ABS, FRPP; max. 4” RNC 3” Aquarise CPVC (2-1/2” concrete over metal deck) (System tested to 50Pa Pressure Differential) ()
| 2 Hour | | | |
| F-A-2046 | F-A-2046 |
Max. 2" Optical Fiber Raceway (closed system only) ()
| 2-hour | | | |
| F-A-2053 | F-A-2053 |
Max. 6" PVC, CPVC, RNC (c,v) (2-1/2" concrete) ()
| 2-hour | | | |
| F-A-2054 | F-A-2054 |
Max. 6" PVC, CPVC, RNC (c,v) ()
| 3-hour | | | |
| F-A-2058 | F-A-2058 |
Max. 2" PVC or CPVC (closed or open) ()
| 2-hour | | | |
| F-A-2065 | F-A-2065 |
Max. 4" ABS or Nom. 6" FRPP (c,v) (2-1/2" concrete) ()
| 2-hour | | | |
| F-A-2066 | F-A-2066 |
Max. 4" ABS or Nom. 6" FRPP (c,v) ()
| 3-hour | | | |
| F-A-2067 | F-A-2067 |
Max. 4" ABS, PVC, or CPVC (c,v) (2-1/2" concrete over metal deck) (AS varies) ()
| 2-hour | | | |
| F-A-2068 | F-A-2068 |
Max. 3" ABS, PVC, or CPVC (c,v) (2-1/2" concrete over metal deck) (AS varies) ()
| 2-hour | | | |
| F-A-2071 | F-A-2071 |
Nom. 4" PVC or ABS closet flange (v) ()
| 3-hour | | | |
| F-A-2072 | F-A-2072 |
Nom. 3" or 4" PVC or ABS closet flange (v) ()
| 3-hour | | | |
| F-A-2074 | F-A-2074 |
Nom. 4" ABS closet flange (v) ()
| 2-hour | | | |
| F-A-2075 | F-A-2075 |
Nom. 4" PVC closet flange (v) ()
| 2-hour | | | |
| F-A-2089 | F-A-2089 |
Max. 3" ABS, PVC, or CPVC (c,v) ()
| 3-hour | | | |
| F-A-2092 | F-A-2092 |
Max. 6" PVC or CPVC (c,v) ()
| 2-hour | | | |
| F-A-2093 | F-A-2093 |
Max. 2" PVC with Shower Drain (v) ()
| 2-hour | | | |
| F-A-2094 | F-A-2094 |
Tub Box with max. 1-1/2" PVC waste/overflow fittings ()
| 3-hour | | | |
| F-A-2095 | F-A-2095 |
Tub Box with max. 1-1/2" PVC waste/overflow fittings ()
| 3-hour | | | |
| F-A-2103 | F-A-2103 |
Multiple max. 2" PVC, CPVC or max. 1" ENT (c) ()
| 2-hour | | | |
| F-A-2141 | F-A-2141 |
Max 6" FRPP, max. 4" FRPP, PVDF, or PP (c,v) ()
| 2-hour | | | |
| F-A-2142 | F-A-2142 |
Max. 4" bundle PEX tubing (max. 1/2" diameter) ()
| 2-hour | | | |
| F-A-2143 | F-A-2143 |
Max. 4" ABS, PVC, or CPVC with pipe coupling (2-1/2" concrete over metal deck) (AS=0" to 1-1/2") ()
| 2-hour | | | |
| F-A-2145 | F-A-2145 |
Max. 2" Flowguard Gold, or max. 3" Blazemaster CPVC pipe (c) ()
| 2 or 3-hr | | | |
| F-A-2154 | F-A-2154 |
PVC, ABS, or CPVC transitioning to Cast Iron or steel (closed or open) ()
| 2-hour | | | |
| F-A-2166 | F-A-2166 |
Max. 6" PVC, CPVC, or RNC (c,v) ()
| 4 Hr | | | |
| F-A-2177 | F-A-2177 |
Nom. 1-1/2" or 2" PVC waste/overflow fittings with tub box (6" Concrete)
| 2 Hr | | | |
| F-A-2205 | F-A-2205 |
Max. 2" PVC or CPVC (c,v) with 1" thick glass fiber insulation ()
| 2-hour | X | | |
| F-A-3001 (cUL) | F-A-3001 (cUL) |
Max. 4” PVC, ABS, CPVC, FRPP, RNC, max. 2” PP or Aquarise CPVC (System tested to 50Pa Pressure Differential) ()
| 2 Hr | | | |
| F-A-3002 (cUL) | F-A-3002 (cUL) |
Max. 1-1/2” XFR-PVC (bottom side access) (System tested to 50Pa Pressure Differential) ()
| 2 Hour | | | |
| F-A-3005 | F-A-3005 |
Cable bundle (various cables) ()
| 2-hour | | | |
| F-A-3007 | F-A-3007 |
Cable bundle (various cables) ()
| 2-hour | | | |
| F-A-3012 | F-A-3012 |
Cable bundle (various cables) (sleeve optional) (2-1/2" concrete over metal deck) ()
| 3-hour | | | |
| F-A-3019 | F-A-3019 |
Cable bundle (various cables) (Unique Sleeve) ()
| 3-hour | | | |
| F-A-3022 | F-A-3022 |
Cable bundle (various cables) (PW Sleeve) ()
| 3-hour | | | |
| F-A-3033 | F-A-3033 |
Cable bundle (various cables) (2-1/2" concrete) (2-1/2" concrete floor) ()
| 3-hour | | | |
| F-A-3034 | F-A-3034 |
Nom. 4/C No 500 kcmill TEK Cable ()
| 3-hour | | | |
| F-A-4003 | F-A-4003 |
Cable Tray ()
| 2-hour | | | |
| F-A-5004 (cUL) | F-A-5004 (cUL) |
Cable bundle (various cables) ()
| 3 Hour | | | |
| F-A-5005 (cUL) | F-A-5005 (cUL) |
Cable bundle (various cables) (2-1/2” concrete floor) ()
| 2 Hour | | | |
| F-A-5009 | F-A-5009 |
Max. 10" steel pipe with 2" glass fiber insulation ()
| 2-hour | | | |
| F-A-5015 | F-A-5015 |
Max. 4" steel or copper pipe with nominal 3/4" AB/PVC insulation (2-1/2" concrete) ()
| 2-hour | | | |
| F-A-5016 | F-A-5016 |
Max. 4" steel or copper pipe with nominal 3/4" AB/PVC insulation ()
| 3-hour | | | |
| F-A-5017 | F-A-5017 |
Max. 4" steel or copper pipe with max. 2" thickness glass-fiber insulation (2-1/2" concrete) ()
| 2-hour | | | |
| F-A-5018 | F-A-5018 |
Max. 4" steel or copper pipe with max. 2" thickness glass-fiber insulation ()
| 3-hour | | | |
| F-A-5019 | F-A-5019 |
Max. 4" steel or copper pipe with max. 3/4" thickness AB/PVC insulation ()
| 2-hour | | | |
| F-A-5021 | F-A-5021 |
Max. 12" steel or max. 6" copper pipe with nom. 1-1/2" thickness glass-fiber insulation ()
| 2-hour | | | |
| F-A-5032 | F-A-5032 |
Max. 3" copper, steel or cast iron with 1" glass fiber or ab/pvc pipe insulation (max qty 3) ()
| 2-hour | | | |
| F-A-5036 | F-A-5036 |
Max. 1-1/2" steel, cast iron or copper with 1" glass fiber or 3/4" AB/PVC (max qty = 5) ()
| 2-hour | | | |
| F-A-5042 | F-A-5042 |
Max. 8" steel, cast iron or max. 4" copper with 1-1/2" glass fiber insulation (AS varies)
| 2-hour | | | |
| F-A-6002 | F-A-6002 |
Electrical busway (23" x 4-1/2") (AS=1/2" to 6-1/2") ()
| 2-hour | | | |
| F-A-7018 | F-A-7018 |
Max. 6" dia sheet metal duct w/o damper ()
| 3-hour | | | |
| F-A-8002 (cUL) | F-A-8002 (cUL) |
Max. 6” steel or cast iron with 1-1/2” glass fiber (2-1/2” concrete floor) ()
| 2 Hour | | | |
| F-A-8004 | F-A-8004 |
Max. 6" steel tube and cables ()
| 2-hour | | | |
| F-A-8012 | F-A-8012 |
Insulated or non-insulated metallic pipes, conduits and cables (single or bundled) in max. 30" x 48" opening ()
| 2-hour | | | |
| F-A-8016 | F-A-8016 |
Multiple HVAC Line Set ()
| 3-hour | | | |
| F-A-8023 | F-A-8023 |
Multiple bundle consisting of steel pipe, ENT, cable bundle ()
| 3-hour | | | |