UL DetailTrade DetailDescriptionF-RatingT-RatingL-RatingW-Rating
C-AJ-0004 (cUL)C-AJ-0004 (cUL) Max. 6” dia blank opening (sleeve optional) (bottom side access) () 3 Hour   
C-AJ-0055C-AJ-0055 Max. 4" steel pipe sleeve  () 3-hour   
C-AJ-0058C-AJ-0058 Max. 4" steel pipe sleeve  () 3-hourX  
C-AJ-0070C-AJ-0070 Max. 7" un-sleeved opening  () 2-hourX  
C-AJ-0074C-AJ-0074 Max. 32" x 32" un-sleeved opening (2-1/2" Concrete) 1-hourX  
C-AJ-0081C-AJ-0081 Max. 32" x 32" un-sleeved opening  () 4-hourXX 
C-AJ-0082C-AJ-0082 Max. 24" x 24" un-sleeved opening  () 2-hourX  
C-AJ-0086C-AJ-0086 Max. 6" un-sleeved opening  () 3-hourX  
C-AJ-0090C-AJ-0090 Max. 6" (optional sleeve) opening  () 2-hour   
C-AJ-0097C-AJ-0097 Max. 4" (sleeved) opening  () 2-hour X 
C-AJ-0105C-AJ-0105 Max. 24" x 24" opening  () 2-hourX  
C-AJ-1010 (cUL)C-AJ-1010 (cUL) Max. 2” steel, cast iron, copper, steel conduit, EMT () 2 Hour   
C-AJ-1011 (cUL)C-AJ-1011 (cUL) Max. 4” steel, cast iron, copper, steel conduit, EMT in optional steel sleeve () 2 & 3 Hr   
C-AJ-1012 (cUL)C-AJ-1012 (cUL) Max. 30” steel, cast iron; 6” copper, steel conduit, or 4” EMT in optional steel sleeve () 3 Hour   
C-AJ-1016 (cUL)C-AJ-1016 (cUL) Max. 8” steel, cast iron; 6” steel conduit, 4” copper or EMT (sleeve optional) (bottom side access) (includes hollow core) () 2 Hour   
C-AJ-1022 (cUL)C-AJ-1022 (cUL) Max. 30” steel, cast iron, 6” copper, steel conduit or 4” EMT (sleeve optional)  () 2 Hour   
C-AJ-1023 (cUL)C-AJ-1023 (cUL) Max. 30" steel, cast iron, 6" copper, steel conduit, or 4" EMT (sleeve optional) () 2 Hour   
C-AJ-1140C-AJ-1140 Max. 12" steel, max. 4" copper, conduit or EMT pipe (one or more) (2-1/2" Concrete) (AS Varies) 3-hour   
C-AJ-1149C-AJ-1149 Max. 10" steel, max. 4" copper, conduit or EMT pipe (AS=0" to 1-1/4") 2-hour   
C-AJ-1150C-AJ-1150 Max. 6" steel, conduit or max. 4" EMT pipe (AS=0" to 1-3/8") 3-hour   
C-AJ-1154C-AJ-1154 Max. 10" steel, max. 4" copper, conduit or EMT pipe (foam as backer) (AS=0" to 3-1/4") 3-hour   
C-AJ-1155C-AJ-1155 Max. 20" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (Sleeve Optional) (AS=0" to 2-1/4") 3-hour   
C-AJ-1156C-AJ-1156 Max. 20" steel pipe (AS=0" to 3") 3-hour   
C-AJ-1158C-AJ-1158 Max/ 10" steel or cast iron pipe (AS=0" to 1-1/4") 2-hour   
C-AJ-1184C-AJ-1184 Max. 10" steel, cast iron, max. 4" copper, conduit or EMT pipe (includes Hollow Core) (AS=0" to 3-1/4") 3-hour   
C-AJ-1226C-AJ-1226 Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (Sleeve Optional) (AS=0" to 1-7/8") 3-hour X 
C-AJ-1276C-AJ-1276 Max. 4" steel, conduit, or EMT pipe (AS=3/4") 3-hour   
C-AJ-1277C-AJ-1277 Max. 2" steel, cast iron, conduit, or EMT pipe (AS=0" to 1-13/16") 3-hour   
C-AJ-1278C-AJ-1278 Max. 30" steel, max. 6" copper, conduit or max. 4" EMT pipe (AS=0" to 7/8") 3-hour   
C-AJ-1291C-AJ-1291 Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (2-1/2" Concrete) (AS=0" to 7/8") 2-hour   
C-AJ-1326C-AJ-1326 Max. 1" flexible steel conduit (AS=1/2" to 1-1/2") 2-hour   
C-AJ-1342C-AJ-1342 Max. 8" aluminum tubing (AS=1/2" to 1-1/2") 2-hour   
C-AJ-1346C-AJ-1346 Max. 1" flexible steel conduit or steel gas piping (2-1/2" Concrete) (AS=1/2" to 1-1/4") 2-hour   
C-AJ-1372C-AJ-1372 Max. 8" steel, max. 4" copper, conduit or EMT pipe (AS=0" to 1-7/8") 3-hour   
C-AJ-1380C-AJ-1380 Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (2-1/2" Concrete) (AS=0" to 1-7/8") 2-hour   
C-AJ-1382C-AJ-1382 Max. 4" Copper, steel, cast iron, steel conduit or EMT (AS=0" to 5-7/8") 3-hour   
C-AJ-1388C-AJ-1388 Max. 4" Steel conduit or EMT (Multiple in max 32" x 7" opening) (AS varies) 2-hour   
C-AJ-1421C-AJ-1421 Max. 4" steel, cast iron, copper, steel conduit or EMT (Optional sleeve) (AS=0" to 5-3/8") 2 & 3-hour   
C-AJ-1425C-AJ-1425 Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (AS=0" to 1-7/8") 3-hour   
C-AJ-1435C-AJ-1435 Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (AS=0" to 1-7/8") 2-hour   
C-AJ-1449C-AJ-1449 Max. 12" steel, cast iron, max. 6" conduit, max. 4" copper or EMT (AS=0" to 5-1/4") 3-hour   
C-AJ-1453C-AJ-1453 Max. 30" steel, cast iron, max. 6" copper, conduit or max. 4" EMT pipe (optional sleeve) (AS=0" to 1-7/8") 2-hour   
C-AJ-1454C-AJ-1454 Max. 6" steel, cast iron, copper, conduit, or 4" EMT (sleeve w/ welded flange) (AS varies) 3-hour   
C-AJ-1498C-AJ-1498 Max. 8" steel, cast iron, 6" steel conduit, 4" EMT or copper (optional sleeve) (AS=0" to 2") () 2-hour   
C-AJ-1513C-AJ-1513 Max. 4" steel conduits, EMT's, or max. 2" flexible steel gas piping (one or more) in 30" x 8" opening (AS=0" to 12") () 2-hour   
C-AJ-1517C-AJ-1517 Max. 24" steel, cast iron, max. 6" copper, conduit, or max. 4" EMT (AS=0" to 2") () 2-hour   
C-AJ-1534C-AJ-1534 Max. 8" steel, cast iron, max. 6" steel conduit, max. 4" copper or EMT (bottoms side access) (AS=0" to 1-7/8") () 2-hour   
C-AJ-1572C-AJ-1572 Max. 2" steel, cast iron, steel conduit or EMT (bottom side access) (AS=3/16" to 7/16") () 2 Hr   
C-AJ-1575C-AJ-1575 Max. 30" steel, cast iron, max. 6" steel conduit, max. 4" EMT and copper (sleeve optional) (min. 2-1/2" concrete) (bottom of top access) (with and without backer) () 2 or 3-hr   
C-AJ-1597C-AJ-1597 Max. 8" steel, cast iron, max. 6" steel conduit, 4" EMT or copper (AS=0" to 2") 3-hourXX 
C-AJ-1606C-AJ-1606 One or more max. 4" steel, cast iron, steel conduit, or EMT (max. 32" x 18" opening) (AS=0" to 7") 2-hour   
C-AJ-1610C-AJ-1610 Max. 4" steel, cast iron, or steel conduit (glass fiber duct insulation above floor) (AS=0" to 1-1/2") 2-hourXXX
C-AJ-2021 (cUL)C-AJ-2021 (cUL) Max 6” PVC, ABS, or CPVC; 4” FRPP or RNC; 3” Aquarise CPVC Plastic Pipe (includes hollow core) (optional pipe coupling on max. 4” ABS pipe only) (System tested to 50Pa Pressure Differential) () 3 Hour   
C-AJ-2022 (cUL)C-AJ-2022 (cUL) Max. 4” PVC, ABS, FRPP,CPVC RNC, or 3” Aquarise CPVC (2-1/2” concrete floor) (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2023 (cUL)C-AJ-2023 (cUL) Max. 2” PVC,CPVC, or Aquarise CPVC (2-1/2” concrete floor) (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2024 (cUL)C-AJ-2024 (cUL) Max. 2” PVC, CPVC, or Aquarise CPVC (knock-out sleeve) (System tested to 50Pa Pressure Differential) () 3 Hour   
C-AJ-2035 (cUL)C-AJ-2035 (cUL) Max. 6” PVC, ABS, FRPP, CPVC, max. 4” RNC or 3” Aquarise CPVC Plastic Pipe (includes hollow core) (System tested to 50Pa Pressure Differential) () 3 Hour   
C-AJ-2036 (cUL)C-AJ-2036 (cUL) Max. 4” ABS, PVC, CPVC, RNC or 3” Aquarise CPVC Plastic Pipe (2-1/2” concrete floor) (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2042 (cUL)C-AJ-2042 (cUL) Max. 2” Blazemaster CPVC plastic pipe () 1 or 2 Hr   
C-AJ-2049 (cUL)C-AJ-2049 (cUL) Nom. 2”, 3” or 4” PVDF plastic pipe (System tested to 50Pa Pressure Differential) () 2 or 3 Hr   
C-AJ-2053 (cUL)C-AJ-2053 (cUL) Max. 6” PVC, ABS, FRPP,CPVC (optional sleeve)(oversized opening) (AS = ¼” to 1-1/4”) (System tested to 50Pa Pressure Differential) () 3 Hour   
C-AJ-2054 (cUL)C-AJ-2054 (cUL) Max. 2” PP plastic pipe (as=0” to ¼”) (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2055 (cUL)C-AJ-2055 (cUL) Max. 2” PP or Aquarise CPVC plastic pipe w/ 1” AB/PVC pipe insulation (as=0” to 5/8”) (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2056 (cUL)C-AJ-2056 (cUL) Max. 2” PP plastic pipe (as=3/16” to 7/16”) (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2057 (cUL)C-AJ-2057 (cUL) Max. 2” PP or Aquarise CPVC plastic pipe w/ 1-1/2” Glass Fiber pipe insulation (as=0” to 5/8”) (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2061 (cUL)C-AJ-2061 (cUL) Max. 2” PVC, CPVC, RNC, Aquarise CPVC or PEX (closed) (AS=0” to 1-5/8”) () 2 Hour   
C-AJ-2065 (cUL)C-AJ-2065 (cUL) Max. 125mm Fusiotherm PP (SDR 11 or SDR 7.4 w/ Faser) (closed) () 2 Hour   
C-AJ-2066 (cUL)C-AJ-2066 (cUL) Max. 50mm Fusiotherm PP (SDR 11) (closed) () 2 Hour   
C-AJ-2070 (cUL)C-AJ-2070 (cUL) Max. 2” Fusiotherm and Climatherm (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2071 (cUL)C-AJ-2071 (cUL) Max. 2” Fusiotherm and Climatherm (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2072 (cUL)C-AJ-2072 (cUL) Max. 1” PEX (includes hollow core) (as= 0“ to 1”) (System tested to 50Pa Pressure Differential) () 2 Hour   
C-AJ-2095C-AJ-2095 Max. 4" PVC or CPVC (closed or open)  () 2 or 3-hr   
C-AJ-2098C-AJ-2098 Max. 2" ENT (closed system only)  () 3-hour   
C-AJ-2109C-AJ-2109 Max.10" PVC, CPVC, max 6" FRPP or ABS (c, v) (optional sleeve) (AS=0" to 1/2" on pipes 6" and smaller, 0" to 1-1/4" on pipes larger than 6") () 3-hour   
C-AJ-2110C-AJ-2110 Max. 6" PVC, CPVC, FRPP or ABS within a steel sleeve (optional steel sleeve) (c,v) (Includes Hollow Core) (AS=1/4" to 1-1/4") 3-hour   
C-AJ-2118C-AJ-2118 Max. 6" glass pipe (closed or open)  () 3-hour   
C-AJ-2141C-AJ-2141 Max. 3" PVC or CPVC (closed system only)  () 3-hour   
C-AJ-2164C-AJ-2164 Max. 1-1/2" PVC or CPVC (closed or open)  () 2-hour   
C-AJ-2167C-AJ-2167 Max. 2" PVC or CPVC (closed or open)  () 2-hour   
C-AJ-2168C-AJ-2168 Max. 3" PVC or CPVC (closed or open)  () 3-hour   
C-AJ-2169C-AJ-2169 Max. 2" PVC or CPVC (closed or open) (Sleeve Optional)  () 2-hour   
C-AJ-2170C-AJ-2170 Max. 1" Polyethylene (PEX) SDR 9 Tubing (closed or open)  () 2-hour   
C-AJ-2217C-AJ-2217 Max. 6" PVDF or 4" PP (closed or open)  () 2-hour   
C-AJ-2218C-AJ-2218 Max. 3" PVC or CPVC (closed or open)  () 2-hour   
C-AJ-2220C-AJ-2220 Max. 2" PVC, CPVC, FRPP or ABS (closed or open)  () 3-hour   
C-AJ-2234C-AJ-2234 Nom. 6" PVC and max. 2" PVDF plastic pipe (Qty. 1) and max. 1" PVDF plastic pipe (Qty. 3) (double-contained)  () 2-hour   
C-AJ-2243C-AJ-2243 Nom. 6" PVC and max. 4" PVDF plastic pipe (double-contained)  () 3-hour   
C-AJ-2283C-AJ-2283 Max. 8" PVC and max. 4" PVDF plastic pipe (closed or open)  () 2-hour   
C-AJ-2284C-AJ-2284 Max. 10" PVC and max. 2" PVDF plastic pipe (closed system)  () 2-hour   
C-AJ-2285C-AJ-2285 Max. 8" PP and max. 4" PP plastic pipe (closed system)  () 2-hour   
C-AJ-2305C-AJ-2305 Max. 8" PVC or CPVC (closed or open)  () 2-hour   
C-AJ-2335C-AJ-2335 Max. 3" PVC or CPVC (closed system)  () 3-hour   
C-AJ-2336C-AJ-2336 Max. 4" PVC, CPVC, ABS, or FRPP with coupler (closed or open)  () 3-hour   
C-AJ-2337C-AJ-2337 Max. 4" ABS (closed or open)  () 3-hour   
C-AJ-2342C-AJ-2342 Max. 3" PVC, ABS, FRPP or CPVC plastic pipe (c,v) (2-1/2" concrete) (AS varies) () 3-hour   
C-AJ-2343C-AJ-2343 Max. 4" PVC, CPVC, ABS, or FRPP (closed or open)  () 3-hour   
C-AJ-2371C-AJ-2371 Max. 6" PVC, CPVC, ABS, or FRPP (closed or open)  () 3-hour   
C-AJ-2372C-AJ-2372 Max. 3" PVC or CPVC (closed or open)  () 3-hour   
C-AJ-2392C-AJ-2392 Max. 4" PVC or CPVC (closed or open)  () 2-hour   
C-AJ-2393C-AJ-2393 Max. 4" PVC or CPVC (closed or open)  () 2-hour   
C-AJ-2402C-AJ-2402 Multiple 2" and 1" ENT's (max. qty 6) (Includes Hollow Core) (AS varies) () 3-hour   
C-AJ-2407C-AJ-2407 Multiple 2" PVC, CPVC, RNC, ENT, max. 1" OFR, PEX (closed systems only) (sleeve optional)  () 2-hour   
C-AJ-2409C-AJ-2409 Max. 10" FRPP plastic pipe (closed or open)  () 3-hour   
C-AJ-2419C-AJ-2419 Max. 4" PVC, ABS, CPVC plastic pipe (closed or open)  () 3-hour   
C-AJ-2420C-AJ-2420 Nominal 10" or 12" PVC or CPVC (c,v) (AS=1/4" to 1") () 3-hour   
C-AJ-2434C-AJ-2434 Max. 4" ABS, PVC, or CPVC plastic pipe (closed or open) - Nonsymmetrical  () 3-hour   
C-AJ-2435C-AJ-2435 Max. 4" ABS, PVC or CPVC plastic pipe (closed or open)  () 3-hour   
C-AJ-2451C-AJ-2451 Max. 2" Flowguard Gold or 3" Blazemaster CPVC pipe (closed)  () 3-hour   
C-AJ-2468C-AJ-2468 Max. 4" diameter Insulated Beverage Lines  () 2-hour   
C-AJ-2469C-AJ-2469 Max. 6" diameter PVC (Sch 80) Closed piping system  () 2-hour   
C-AJ-2488C-AJ-2488 Max. 4" diameter ABS, PVC, or CPVC (closed or open)  () 2-hour   
C-AJ-2565C-AJ-2565 Max. 4" diameter PVC, ABS, CPVC, FRPP, or RNC (closed or open) (AS varies) () 2-hour   
C-AJ-2566C-AJ-2566 Max. 4" diameter PVC, ABS, CPVC, FRPP, or RNC (closed or open) (AS varies) () 2-hour   
C-AJ-2567C-AJ-2567 Max. 2" PVC, CPVC or RNC (closed or open) (sleeve optional) (AS w/sleeve = 1/4" to 1-3/8") (AS w/o sleeve = 0" to 1-5/8") () 2-hour   
C-AJ-2569C-AJ-2569 Max.4" PVC, ABS, or CPVC (closed or open) (sleeve optional on pipes 3" and smaller) (AS varies) (bottom side access) () 2-hour   
C-AJ-2570C-AJ-2570 Nom. 6" PVC, CPVC, or RNC (closed or open)  () 2-hour   
C-AJ-2599C-AJ-2599 Max. 5" Fusiotherm PP plastic pipe (closed or vented) (AS=0" to 1") () 2-hour   
C-AJ-2600C-AJ-2600 Max. 2" Fusiotherm PP plastic pipe (closed or vented) (AS=0" to 5/8") () 2-hour   
C-AJ-2613C-AJ-2613 Max. 2" Fusiotherm or Climatherm PP plastic pipe (closed or vented) (AS=0" to 5/16") () 2-hour   
C-AJ-2630C-AJ-2630 Max. 4" PVC, ABS, CPVC, or FRPP (c,v) (2-1/2" concrete) (AS=0" to 3-1/2") 2-hour   
C-AJ-2631C-AJ-2631 Max. 4" PVC, ABS, CPVC, or FRPP (c,v) (2-1/2" concrete) (AS=0" to 3-1/2") 2-hour   
C-AJ-2632C-AJ-2632 Max. 2" PVC/CPVC with 1" glass fiber pipe insulation (c) (AS=3/16" to 1-1/8") 2-hourX  
C-AJ-3007 (cUL)C-AJ-3007 (cUL) Max. 2” Metal Clad TEK Cable (one or more) () 2 Hour   
C-AJ-3070C-AJ-3070 Cables (separated)  () 3-hour   
C-AJ-3084C-AJ-3084 Cable bundle (telephone cables) PVC sleeve  () 3-hour   
C-AJ-3095C-AJ-3095 Cable bundle (various cables) (Steel sleeve optional) (2-1/2" Concrete) () 3-hour   
C-AJ-3096C-AJ-3096 Cable bundle (various cables) (Steel sleeve optional)  () 3-hour   
C-AJ-3138C-AJ-3138 Single cable (telephone cable)  () 3-hour   
C-AJ-3152C-AJ-3152 Cable bundle (various cables) (Steel sleeve)  () 2-hour   
C-AJ-3180C-AJ-3180 Cable bundle (various cables) (Steel sleeve optional)  () 3-hour   
C-AJ-3181C-AJ-3181 Cable bundle (various cables) (Steel sleeve optional)  () 3-hour   
C-AJ-3193C-AJ-3193 Cable bundle (various cables) (Steel sleeve optional)  () 3-hour   
C-AJ-3198C-AJ-3198 Cable bundle (various cables) (PVC sleeve)  () 3-hour   
C-AJ-3208C-AJ-3208 Cable bundle (various cables) (PVC or steel sleeve)  () 3-hour   
C-AJ-3209C-AJ-3209 Cable bundle (various cables) (sleeve w/ welded flange)  () 3-hour   
C-AJ-3210C-AJ-3210 Cable bundle (various cables) (Steel sleeve optional)  () 3-hour   
C-AJ-3216C-AJ-3216 Cable bundle (various cables) (Steel sleeve)  () 2-hour   
C-AJ-3232C-AJ-3232 Cable bundle (various cables) (PW Sleeve)  () 2-hour   
C-AJ-3236C-AJ-3236 Single Cable (4/C 750 kcmil TEK Cable)  () 2-hour   
C-AJ-3239C-AJ-3239 Cable bundle (various cables) (Steel sleeve optional) (bottom side access)  () 3-hour   
C-AJ-3268C-AJ-3268 Cable bundle (various cables) in flexible nylon raceway (PVC sleeve optional) (AS=0" to 3") () 3 Hr   
C-AJ-3269C-AJ-3269 Cable bundle (various cables) in flexible nylon raceway (steel sleeve optional) (AS=0" to 3") () 2 Hr   
C-AJ-3279C-AJ-3279 Cable bundle (various cables) in PVC sleeve (2-1/2" concrete)  () 2 Hr   
C-AJ-3281C-AJ-3281 Blank CP 653 Speed Sleeve (access both sides)  () 2 Hr   
C-AJ-3281C-AJ-3281 Cable bundle (various cables) through CP 653 Speed Sleeve () 2-hour   
C-AJ-3282C-AJ-3282 Blank CP 653 Speed Sleeve (top side access)  () 2 Hr   
C-AJ-3282C-AJ-3282 Cable bundle (various cables) through CP 653 Speed Sleeve () 2-hour   
C-AJ-3283C-AJ-3283 Blank CP 653 Speed Sleeve (top side access)  () 2 Hr   
C-AJ-3283C-AJ-3283 Cable bundle (various cables) through CP 653 Speed Sleeve () 2-hour   
C-AJ-3284C-AJ-3284 Blank CP 653 Speed Sleeve (bottom side access)  () 2 Hr   
C-AJ-3284C-AJ-3284 Cable bundle (various cables) through CP 653 Speed Sleeve () 2 Hr   
C-AJ-3285C-AJ-3285 Blank CP 653 Speed Sleeve (top side access) () 3-hour   
C-AJ-3285C-AJ-3285 Cable bundle (various cables) through CP 653 Speed Sleeve () 3-hour X 
C-AJ-3298C-AJ-3298 Cable bundle (various cables) through CP 653 Speed Sleeve (Unifrax Insulation)  X  
C-AJ-4017C-AJ-4017 Cable Tray  () 3-hour   
C-AJ-4034C-AJ-4034 Cable Tray  () 3-hour   
C-AJ-4035C-AJ-4035 Cable Tray  () 3-hour   
C-AJ-4054C-AJ-4054 Cable Tray  () 2-hour   
C-AJ-4071C-AJ-4071 Cable Tray  () 2-hour   
C-AJ-4077C-AJ-4077 Cable Rack  () 2-hour   
C-AJ-4083C-AJ-4083 Steel or Aluminum Cable Tray (36" x 6") (AS=0" to 2-1/4") () 2 Hr   
C-AJ-5044C-AJ-5044 Multiple insulated steel and copper pipes (max. 3")  () 3-hour   
C-AJ-5048C-AJ-5048 Max. 2" steel pipe with max. 1" glass fiber insulation  () 2-hour   
C-AJ-5061C-AJ-5061 Max. 20" steel, cast iron, max. 6" copper pipe with max. 3" Glass fiber insulation (Steel sleeve optional)  () 3-hour   
C-AJ-5069C-AJ-5069 Max. 12" steel, max. 6" copper pipe with max. 3" FOAMGLASS insulation (Steel sleeve optional) (AS=3/4" to 3") () 2-hour   
C-AJ-5090C-AJ-5090 Max. 4" steel, copper pipe with max. 3/4" AB/PVC insulation (AS=1/2" to 2-1/4") () 3-hour   
C-AJ-5091C-AJ-5091 Max. 12" steel, cast iron, max. 6" copper pipe with nom. 2" glass fiber or max. 2" thick calcium silicate insulation (Steel sleeve optional) (AS=1/2" to 2-1/4") () 2-hour   
C-AJ-5096C-AJ-5096 Max. 12" steel, max. 6" copper with max. 1-1/2" glass fiber insulation (Steel sleeve optional) (2-1/2" concrete) (AS=1/2" to 1-7/8") () 2-hour   
C-AJ-5098C-AJ-5098 Max. 6" steel or copper pipe with max. 3" thick glass fiber insulation (Steel sleeve optional) (AS=1/2") () 2-hour   
C-AJ-5184C-AJ-5184 Max. 6" steel or copper pipe with max. 3" thick mineral fiber insulation (AS=1/2" to 1-1/2") () 3-hour   
C-AJ-5185C-AJ-5185 Max. 24" steel, cast iron, max. 4" copper with max. 3" thick mineral fiber insulation butted up to firestop assembly (AS=0" to 1-7/8") () 3-hour   
C-AJ-5198C-AJ-5198 Max. 4" steel or copper pipe with max. 3/4" AB/PVC insulation (2-1/2" concrete) (AS=0" to 1-3/8") () 2-hour   
C-AJ-5230C-AJ-5230 Max. 4" steel, cast iron, or copper pipe w/ max. 2" glass fiber (sleeve w/ welded flange)  () 2-hour   
C-AJ-5264C-AJ-5264 Max. 3" steel, cast iron, or copper pipe with nom. 2" thick Phenolic Foam insulation (Koolphen® K)  () 2-hour   
C-AJ-5265C-AJ-5265 Max. 6" steel, cast iron, or copper pipe w/ max. 2" glass fiber (optional sleeve)  () 2-hour   
C-AJ-5276C-AJ-5276 Max. 12" steel or cast iron with nom. 2" phenolic foam pipe insulation (Koolphen K) (AS=3/8" to 1-5/8") 2-hour   
C-AJ-5277C-AJ-5277 Max. 12" steel, 6" copper with nom. 1-1/2" or 3" thick Foam Glass pipe insulation in min. 2-1/2" concrete  () 2-hour   
C-AJ-5289C-AJ-5289 Max. 2" copper, steel, or cast iron with 1/2" to 1" AB/PVC insulation (bottom side access)  () 3-hour   
C-AJ-5295C-AJ-5295 Max. 3" steel, cast iron, or copper with 2" polyisocyanurate foam insulation  () 2-hour   
C-AJ-5301C-AJ-5301 Max. 6" steel, cast iron, or copper with 2" glass fiber insulation (AS=0" to 1-7/8") () 2-hour   
C-AJ-5320C-AJ-5320 Max. 1" PVC with 3/4" AB/PVC (AS=0" to 3/16") 2-hour   
C-AJ-6006C-AJ-6006 Electrical busway (23" x 4-1/2") (2-1/2" concrete) () 3-hour   
C-AJ-6017C-AJ-6017 Electrical busway (26" x 6")  () 3-hour   
C-AJ-6036C-AJ-6036 Electrical busway (23" x 4-1/2", qty 1) or (11-1/4" x 4-1/2", qty 2) (AS=1/4" to 5-3/4") () 2-hour   
C-AJ-7006C-AJ-7006 Max. 36" grease duct manufactured by Metal-Fab (AS=1") () 3-hour   
C-AJ-7029C-AJ-7029 Flamebar BW 11 Fire Rated Duct Work ()     
C-AJ-7046C-AJ-7046 Max. 32" x 32" sheet metal duct w/o damper  () 3-hour   
C-AJ-7051C-AJ-7051 Max. 30" x 30" sheet metal duct w/o damper  () 3-hour   
C-AJ-7084C-AJ-7084 Max. 20" spiral wound sheet metal duct or max. 12" sheet metal duct (min 28 ga)  () 2-hour   
C-AJ-7095C-AJ-7095 Steel air duct with 1-1/2" thick FireMaster FireWrap+ manufactured by Thermal Ceramics (AS=3") () 2-hour   
C-AJ-7098C-AJ-7098 Max. 49" x 49" steel grease duct with 1-1/2" Firemaster® Fast Wrap manufactured by Thermal Ceramics  () 2-Hour   
C-AJ-7103C-AJ-7103 Max. 6" sheet metal duct w/o damper (bottom side access) (hollow core)  () 2-hour   
C-AJ-7104C-AJ-7104 Max. 24" x 12" sheet metal duct w/o damper (bottom side access)  () 2-hour   
C-AJ-7111C-AJ-7111 Max. 30" x 30" sheet metal duct w/o damper (2-1/2" concrete)  () 2-hour   
C-AJ-7119C-AJ-7119 Nom. 48" x 44" steel grease duct with Firemaster Duct Wrap by Thermal Ceramics (AS=1/2" to 4-3/4") () 2-hour   
C-AJ-7122C-AJ-7122 Max. 24" x 12" steel air or grease duct with Duct Wrap by Unifrax (AS=1-1/4" to 1-3/4") () 1 or 2-hr   
C-AJ-7123C-AJ-7123 Max. 24" x 24" steel air or grease duct with Duct Wrap by Unifrax (AS=1") () 2-hour   
C-AJ-7140C-AJ-7140 Max. 38" Fyreguard Grease Duct, mfg by Schebler Co (AS=1/2" to 1-1/2") 2-hourX  
C-AJ-8014 (cUL)C-AJ-8014 (cUL) Multiple penetrants through 32" x 32" opening () 2-hour   
C-AJ-8038C-AJ-8038 Multiple insulated and non-insulated copper pipes (max. 3") (AS=1" to 2-1/4") 3-hour   
C-AJ-8041C-AJ-8041 Multiple insulated and non-insulated steel and copper pipes (max. 3" steel/copper) (AS varies) () 3-hour   
C-AJ-8044C-AJ-8044 Insulated and non-insulated steel and copper pipe (max. 1" steel/copper) (AS=3/8" to 2") () 3-hour   
C-AJ-8056C-AJ-8056 Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, cable tray or cables (single or bundled) (AS varies) () 3-hour   
C-AJ-8058C-AJ-8058 Multiple insulated and non-insulated copper pipe, max. 1-1/2" PVC (open or closed) and cables (2-1/2" concrete) () 2-hour   
C-AJ-8081C-AJ-8081 Max. 6" steel tube and cables (AS varies) () 2-hour   
C-AJ-8095C-AJ-8095 Max. 6" steel, cast iron, copper, conduit, or max. 4" EMT pipe  () 4-hour   
C-AJ-8096C-AJ-8096 Insulated or non-insulated steel, cast iron, copper, conduit or EMT pipes, flexible metal conduit or cables (single or bundled)  () 2-hour   
C-AJ-8099C-AJ-8099 Insulated or non-insulated copper or steel, flexible steel gas lines, cables (single or bundled), or flexible steel conduit (includes Hollow Core) (AS Varies) 3-hour   
C-AJ-8100C-AJ-8100 Insulated or non-insulated copper or cables (single or bundled) (AS varies) () 3-hour   
C-AJ-8107C-AJ-8107 Max. 2" EMT or conduit, single or bundled cables, Max. 2" PVC Innerduct (AS varies) () 3-hour   
C-AJ-8110C-AJ-8110 Max. 8" steel, cast iron, 6" copper, steel conduit, or max. 4" EMT, Max. 2" Innerduct, Cable Tray, Large cables, (various cables) (AS varies) () 3-hour   
C-AJ-8143C-AJ-8143 Insulated or non-insulated metallic pipes, conduits and cables (single or bundled) in max. 30" x 48" opening (AS varies) () 2-hour   
C-AJ-8148C-AJ-8148 HVAC line set (optional sleeve)  () 2-hour   
C-AJ-8166C-AJ-8166 HVAC line set (optional sleeve) (bottom side access)  () 3-hour   
C-AJ-8177C-AJ-8177 Insulated or non-insulated metallic pipes, conduits, non-metallic pipes cables, and sheet metal duct  () 2-hour   
C-AJ-8178C-AJ-8178 HVAC line set w/ PVC drain  () 2-hour   
C-AJ-8180C-AJ-8180 Insulated or non-insulated copper or steel, cables (single or bundled), or flexible steel conduit (AS Varies) () 2 Hr